One evidence base: the loan, the customer and the public
Tindrevik Components reports two loan KPIs to Halvorne Bank; the same evidence answers Brakvold Machines' questionnaire and feeds its living site and deck.
Evidence: meter readings, invoices and production records behind each KPI, with their versions. Performance: baselines, sustainability performance targets and KPI values by year. Connected outcomes: KPI data shared with the lender at the level agreed, every value traced to its records.
Tindrevik ComponentsBorrower and supplier
Halvorne BankLender
Brakvold MachinesCustomer
Demo verifierExternal verifier
The publicReaders of the living site and deck
FacilitySustainability-linked loan, EUR 8 million revolving credit facility (fictional)
Instrument
Sustainability-linked loan: EUR 8 million revolving credit facility (fictional), signed 2026-03-16, Halvorne Bank
Reporting
Annually, by 31 March after each financial year, to Halvorne Bank
Consequence
A margin adjustment per KPI as set in the facility agreement (recorded as text; not calculated by Sustin)
Verification
Annual external verification of the KPI values by a qualified third party, as agreed in the facility; the verification report is held by the lender
Principles
Sustainability-Linked Loan Principles, March 2025 (registry ED-SLLP-2025)
Fictional organisations and data. Read-only and scripted: no account, nothing stored; the bank's access is a controlled demo on this page, not a production permission system. The request analysis with AI is in the Analyse tab on Home.
01 · Workspace
KPIs, baselines, targets and evidence in the workspace
Evidence assistantTindrevik Components keeps two loan KPIs with dated values, baselines, targets and evidence. Each value has a tier: private, shared with the lender, or approved for publication.
Evidence: records with source, period, scope, version and permission, tracked and updated continuously. Intelligence: mapping to requirements and frameworks, cross-checks and gaps. Connected outcomes: the same records feed customer answers, KPI data, packs, living sites and decks.
K1 · Energy intensity
1.80MWh per tonne of finished parts · 2027
Approved for publicationNot verifiedTarget 2027: at most 1.85
Values by year, definition and method
Energy consumed at both sites and by company vehicles and forklifts, per tonne of finished parts produced.
Energy intensity by year
Year
Value
Target
Tier
Verification
2025 (baseline)
2.09 MWh per tonne of finished parts
–
Approved for publication
Not verified: no verification record attached
2026
1.95 MWh per tonne of finished parts
–
Approved for publication
Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)
2027
1.80 MWh per tonne of finished parts
at most 1.85
Approved for publication
Not verified: no verification record attached
Q1 2028
Draft, not approved
–
Private
–
K2 · Renewable share of purchased electricity
18% · 2027
Shared with the lenderNot verifiedTarget 2027: at least 20%
Method change, effective FY2027: Method: unbundled certificates excluded.Reason and approval
Aligned with the definition agreed with Halvorne Bank; no certificates were bought in 2025 or 2026, so earlier values are unchanged. Approved by Tindrevik Components, CFO.
Values by year, definition and method
Purchased electricity covered by the supplier's disclosed renewable fuel mix for the supply contract, as a share of purchased electricity (MWh). Method: Market-based: the supplier's fuel-mix disclosure for the contract; unbundled certificates excluded.
Renewable share of purchased electricity by year
Year
Value
Target
Tier
Verification
2025 (baseline)
12%
–
Approved for publication
Not verified: no verification record attached
2026
15%
–
Approved for publication
Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)
2027
18%
at least 20%
Shared with the lender
Not verified: no verification record attached
Q1 2028
Draft, not approved
–
Private
–
The evidence records
Energy · E1 to E3
E1Electricity invoices, 20271,190 MWhJan to Dec 2027Both sites (Aarhus plant, Gdańsk workshop)v3 · pack v2
Source
Fictional utility, monthly invoices
Period
Jan to Dec 2027
Scope
Both sites (Aarhus plant, Gdańsk workshop)
Electricity consumed
1,190 MWh
Supplier renewable share
18 %
Version 3 of 3; the issued pack uses v2: version history
v3 2028-04-02: The utility re-billed March 2027 after a meter fault
v2 2028-02-03: Final December invoice received
v1 2028-01-12: November and December estimated by the utility
E2Gas invoices, 2027612 MWhJan to Dec 2027Aarhus plant only; Gdańsk has no gas supplyv1
Source
Fictional gas supplier, quarterly invoices
Period
Jan to Dec 2027
Scope
Aarhus plant only; Gdańsk has no gas supply
Natural gas
612 MWh
Version 1 of 1: version history
v1 2028-01-20: Four quarterly invoices
E3Fuel log, 202711,600 litresJan to Dec 2027Company vehicles and forkliftsv1
Source
Fleet and forklift fuel log, kept by the site manager
Period
Jan to Dec 2027
Scope
Company vehicles and forklifts
Diesel
11,600 litres
Energy equivalent
116 MWh
Version 1 of 1: version history
v1 2028-01-08: Year-end total
Production · T-OUT-2025 to T-OUT-2027
T-OUT-2025Production ledger, 2025980 tJan to Dec 2025Finished parts produced at both sitesv1
Source
ERP production ledger
Period
Jan to Dec 2025
Scope
Finished parts produced at both sites
Finished parts produced
980 t
Version 1 of 1: version history
v1 2026-01-14: Year-end close
T-OUT-2026Production ledger, 20261,016 tJan to Dec 2026Finished parts produced at both sitesv1
Source
ERP production ledger
Period
Jan to Dec 2026
Scope
Finished parts produced at both sites
Finished parts produced
1,016 t
Version 1 of 1: version history
v1 2027-01-15: Year-end close
T-OUT-2027Production ledger, 20271,062 tJan to Dec 2027Finished parts produced at both sitesv1
Source
ERP production ledger
Period
Jan to Dec 2027
Scope
Finished parts produced at both sites
Finished parts produced
1,062 t
Version 1 of 1: version history
v1 2028-01-25: Year-end close
Yearly summaries · T-ENERGY-2025 to T-ENERGY-2026
T-ENERGY-2025Energy summary, 2025 (baseline year)2,046 MWhJan to Dec 2025Both sites, company vehicles and forkliftsv1
Source
Electricity and gas invoices and the fuel log, 2025
Period
Jan to Dec 2025
Scope
Both sites, company vehicles and forklifts
Energy consumed
2,046 MWh
Supplier renewable share
12 %
Version 1 of 1: version history
v1 2026-02-10: From the 2025 invoices and fuel log
T-ENERGY-2026Energy summary, 20261,978 MWhJan to Dec 2026Both sites, company vehicles and forkliftsv1
Source
Electricity and gas invoices and the fuel log, 2026
Period
Jan to Dec 2026
Scope
Both sites, company vehicles and forklifts
Energy consumed
1,978 MWh
Supplier renewable share
15 %
Version 1 of 1: version history
v1 2027-02-08: From the 2026 invoices and fuel log
Other · E4 to E5
E4HR headcount export64Reporting date 31 Dec 2027All employees; no hours workedv1
Source
Fictional HR system, export at 31 Dec 2027
Period
Reporting date 31 Dec 2027
Scope
All employees; no hours worked
Employees
64
Permanent / temporary
58 / 6
Training hours
896 hours
Version 1 of 1: version history
v1 2028-01-05: Export at the reporting date
E5Accident register3Jan to Dec 2027Employees; contractors not recorded; fatalities from work-related ill health not coveredv1
Source
Site accident book, both sites
Period
Jan to Dec 2027
Scope
Employees; contractors not recorded; fatalities from work-related ill health not covered
Recordable accidents
3
Fatalities (injuries)
0
Version 1 of 1: version history
v1 2028-01-09: Both sites
Draft · T-DRAFT-Q1-2028
T-DRAFT-Q1-2028Energy and output, first quarter 2028 (draft)468 MWhJan to Mar 2028Both sitesv1
1,912 / 1,062 = 1.80 MWh per tonne of finished parts
Current (E1 v3): 1.81 · Issued pack (E1 v2): 1.80
The pack is fixed at the evidence version it was issued from: the re-billed March invoice (E1 v3) changes the current value, and would go into a new version of the pack, not into the issued one.
Calculated by Sustin from the records, method shown; the borrower approved the value on 2028-03-25.
Permissions assistantThe bank sees the loan's KPIs and their evidence and nothing else; every view is logged. Revoke the share and the bank sees nothing.
Tindrevik Components sees
K1 · Energy intensity
2025: 2.09 MWh per tonne of finished partsApproved for publicationShared
2026: 1.95 MWh per tonne of finished partsApproved for publicationShared
2027: 1.80 MWh per tonne of finished partsApproved for publicationShared
Q1 2028: draftPrivateNot shared
K2 · Renewable share of purchased electricity
2025: 12%Approved for publicationShared
2026: 15%Approved for publicationShared
2027: 18%Shared with the lenderShared
Q1 2028: draftPrivateNot shared
Records
E1 Electricity invoices, 2027 Shared
E2 Gas invoices, 2027 Shared
E3 Fuel log, 2027 Shared
E4 HR headcount export Not shared
E5 Accident register Not shared
T-OUT-2025 Production ledger, 2025 Shared
T-OUT-2026 Production ledger, 2026 Shared
T-OUT-2027 Production ledger, 2027 Shared
T-ENERGY-2025 Energy summary, 2025 (baseline year) Shared
T-ENERGY-2026 Energy summary, 2026 Shared
T-DRAFT-Q1-2028 Energy and output, first quarter 2028 (draft) Not shared
Halvorne Bank sees
K1 · Energy intensity
2025: 2.09 MWh per tonne of finished partsApproved for publication
2026: 1.95 MWh per tonne of finished partsApproved for publication
2027: 1.80 MWh per tonne of finished partsApproved for publication
Not sharedHidden from the bank
K2 · Renewable share of purchased electricity
2025: 12%Approved for publication
2026: 15%Approved for publication
2027: 18%Shared with the lender
Not sharedHidden from the bank
Evidence the bank can open
E1 Electricity invoices, 2027
E2 Gas invoices, 2027
E3 Fuel log, 2027
Not sharedHidden from the bank
Not sharedHidden from the bank
T-OUT-2025 Production ledger, 2025
T-OUT-2026 Production ledger, 2026
T-OUT-2027 Production ledger, 2027
T-ENERGY-2025 Energy summary, 2025 (baseline year)
T-ENERGY-2026 Energy summary, 2026
Not sharedHidden from the bank
Share: SLL-2026, KPIs K1 and K2 and their evidence, granted 2028-03-28 by Tindrevik Components, CFO. Access log: Halvorne Bank, sustainable finance desk (demo user) viewed Annual KPI Evidence Pack FY2027 v1, 2028-03-29 09:14.
Pack assistantIssued from a fixed evidence version. A later correction to the electricity invoices shows as newer evidence; the issued pack never changes.
Prepared by Sustin from the borrower's records and approved by the borrower. Each verification statement comes from an attached third-party report; Sustin tracks the verification status of every value. Who does what: sustin.ai/method#roles.
Externally verified · DV-2027-112Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)
Externally verified · DV-2027-112Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)
Brakvold Machines' questionnaire from the same evidence
Request assistantQ4 is answered from the same invoice versions as the pack. The loan's renewable-electricity KPI is not reused for Q5: its definition and scope differ, and that is flagged.
General
Q1Which module of the Voluntary Standard do you report under, and do you state compliance with it?
Answered
Basic Module; statement included in the 2027 report
Q2On what basis do you prepare this information: individual or consolidated?
Answered
Individual basis
Q3Please give your general undertaking information: legal form, sector code, size and locations.
Electricity: 18% renewable per supplier mix; fuels: non-renewable
Reuse condition example. Not reused: the loan KPI "Renewable share of purchased electricity" covers purchased electricity only; Q5 asks for all energy (definition and scope differ)
Q6What were your gross Scope 1 and location-based Scope 2 emissions, in tCO2e?
Claims assistantEach draft sentence is checked for risk flags and missing evidence, with the legal basis.
Risk flags
“Tindrevik runs on green energy and is climate-neutral.”
Risk flags
“green”: state the figure, its period and its scope instead of a general claim such as “green” or “climate neutral” (Directive (EU) 2024/825); no scores, ratings, badges or seals; A neutrality or offset-based claim about the organisation or its products
Missing evidence
Evidence of the emissions basis and of any offsets
Risk flags
“We will halve our energy intensity by 2030.”
Risk flags
A claim about future environmental performance
Missing evidence
A detailed, realistic implementation plan with measurable targets and independent monitoring
Supported
“Energy intensity fell to 1.80 MWh per tonne of finished parts in 2027, from 2.09 in 2025.”
Risk flags
None
Missing evidence
None
Legal basis: Directive (EU) 2024/825 (registry ED-ECGT-2024), amending Directive 2005/29/EC (consolidated, ED-UCPD-2024-825), and its national implementation.