Living site Demo, fictional data

Tindrevik Components: progress

Tindrevik Components is a fictional manufacturer of metal components, with a plant in Aarhus, Denmark, and a workshop in Gdańsk, Poland. Last updated 2 April 2028.

Progress

  • Energy intensity, 2026

    1.95 MWh per tonne of finished parts

    On track
    Baseline
    2.09 MWh per tonne of finished parts (2025)
    Target
    None for 2026; the first, at most 1.85, applies to 2027
    Actual
    1.95 MWh per tonne of finished parts
    Period
    Jan to Dec 2026
    Scope
    Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts
    Trend: 2025 2.09 · 2026 1.95 · 2027 1.80
    Source note
    Source
    Electricity and gas invoices and the fuel log, 2026 (T-ENERGY-2026 v1); ERP production ledger (T-OUT-2026 v1)
    Period and scope
    Jan to Dec 2026; Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts
    Definition
    Energy consumed at both sites and by company vehicles and forklifts, per tonne of finished parts produced.
    Method
    Energy consumed (MWh): electricity (invoices) + natural gas (invoices) + fuel energy equivalent (fuel log) / Finished parts produced (t), from the ERP production ledger
    Baseline, target, observed
    2.09 MWh per tonne of finished parts (2025); no target for 2026; 1.95 MWh per tonne of finished parts
    Last update and version
    2027-02-08; evidence version of pack KPI-PACK-FY2027 v1
    Verification
    Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)

    Records behind the figure

    • T-ENERGY-2026 · Energy summary · Jan to Dec 2026 · Both sites, company vehicles and forklifts · v1
    • T-OUT-2026 · Production ledger · Jan to Dec 2026 · Finished parts produced at both sites · v1
  • Energy intensity, 2027

    1.80 MWh per tonne of finished parts

    Target met
    Baseline
    2.09 MWh per tonne of finished parts (2025)
    Target
    at most 1.85 (2027)
    Actual
    1.80 MWh per tonne of finished parts
    Period
    Jan to Dec 2027
    Scope
    Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts
    Trend: 2025 2.09 · 2026 1.95 · 2027 1.80
    Source note
    Source
    Fictional utility, monthly invoices (E1 v2); Fictional gas supplier, quarterly invoices (E2 v1); Fleet and forklift fuel log, kept by the site manager (E3 v1); ERP production ledger (T-OUT-2027 v1)
    Period and scope
    Jan to Dec 2027; Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts
    Definition
    Energy consumed at both sites and by company vehicles and forklifts, per tonne of finished parts produced.
    Method
    Energy consumed (MWh): electricity (invoices) + natural gas (invoices) + fuel energy equivalent (fuel log) / Finished parts produced (t), from the ERP production ledger
    Baseline, target, observed
    2.09 MWh per tonne of finished parts (2025); target at most 1.85; 1.80 MWh per tonne of finished parts (met)
    Last update and version
    2028-02-03; evidence version of pack KPI-PACK-FY2027 v1
    Verification
    Not verified: no verification record attached

    Records behind the figure

    • E1 · Electricity invoices · Jan to Dec 2027 · Both sites (Aarhus plant, Gdańsk workshop) · v2
    • E2 · Gas invoices · Jan to Dec 2027 · Aarhus plant only; Gdańsk has no gas supply · v1
    • E3 · Fuel log · Jan to Dec 2027 · Company vehicles and forklifts · v1
    • T-OUT-2027 · Production ledger · Jan to Dec 2027 · Finished parts produced at both sites · v1
  • Renewable share of purchased electricity, 2026

    15%

    On track
    Baseline
    12% (2025)
    Target
    None for 2026; the first, at least 20%, applies to 2027
    Actual
    15%
    Period
    Jan to Dec 2026
    Scope
    Electricity purchased for both sites
    Trend: 2025 12% · 2026 15%

    2027: pending publication. Shared with Halvorne Bank; not yet approved for publication.

    Source note
    Source
    Electricity and gas invoices and the fuel log, 2026 (T-ENERGY-2026 v1)
    Period and scope
    Jan to Dec 2026; Electricity purchased for both sites
    Definition
    Purchased electricity covered by the supplier's disclosed renewable fuel mix for the supply contract, as a share of purchased electricity (MWh).
    Method
    Market-based: the supplier's fuel-mix disclosure for the contract; unbundled certificates excluded
    Baseline, target, observed
    12% (2025); no target for 2026; 15%
    Last update and version
    2027-02-08; evidence version of pack KPI-PACK-FY2027 v1
    Verification
    Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)

    Records behind the figure

    • T-ENERGY-2026 · Energy summary · Jan to Dec 2026 · Both sites, company vehicles and forklifts · v1

Approved figures only: values shared only with the lender are not published. Target met: the value meets the target for its year. On track: the value has moved from the baseline towards a target that is not yet due.

Walk-through: /demo.

Commitments

Energy intensity

At most 1.85 MWh per tonne of finished parts by 2027

Target met: 1.80 in 2027
Target
at most 1.85 MWh per tonne of finished parts in 2027; later targets at most 1.75 in 2028 and at most 1.70 in 2029
Deadline
Financial year 2027; reported annually, by 31 March after each financial year, to Halvorne Bank
Plan
Recover heat from the Aarhus press line and cover a quarter of the Aarhus plant’s electricity with the solar roof; the solar roof and the heat recovery pilot are paid from the company’s own budget; run by the plant manager and a part-time energy coordinator.
How progress is measured
Energy consumed at both sites and by company vehicles and forklifts, per tonne of finished parts produced. Numerator: Energy consumed (MWh): electricity (invoices) + natural gas (invoices) + fuel energy equivalent (fuel log). Denominator: Finished parts produced (t), from the ERP production ledger. Boundary: Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts.
Verification
KPI K1 is checked annually by an external verifier under the loan agreement; the verification report is held by the lender. For 2026: limited assurance on the 2026 values of both KPIs, report DV-2027-112, 20 April 2027.

Evidence

The records behind the figures and statements on this page. No documents are shown; each record keeps its source, period, coverage and version.

RecordTypePeriodCoverageVersionLast updated
E1 · Electricity invoices, 2027Electricity invoicesJan to Dec 2027Both sites (Aarhus plant, Gdańsk workshop)v3 (published figures: v2)2 April 2028
E2 · Gas invoices, 2027Gas invoicesJan to Dec 2027Aarhus plant only; Gdańsk has no gas supplyv120 January 2028
E3 · Fuel log, 2027Fuel logJan to Dec 2027Company vehicles and forkliftsv18 January 2028
T-OUT-2027 · Production ledger, 2027Production ledgerJan to Dec 2027Finished parts produced at both sitesv125 January 2028
T-ENERGY-2026 · Energy summary, 2026Energy summaryJan to Dec 2026Both sites, company vehicles and forkliftsv18 February 2027
T-OUT-2026 · Production ledger, 2026Production ledgerJan to Dec 2026Finished parts produced at both sitesv115 January 2027
T-ENERGY-2025 · Energy summary, 2025 (baseline year)Energy summaryJan to Dec 2025Both sites, company vehicles and forkliftsv110 February 2026
T-OUT-2025 · Production ledger, 2025Production ledgerJan to Dec 2025Finished parts produced at both sitesv114 January 2026

Claims

  • Supported by evidence

    Energy intensity fell from 1.95 MWh per tonne of finished parts in 2026 to 1.80 in 2027.

    Rests on: T-ENERGY-2026 v1, T-OUT-2026 v1, E1 v2, E2 v1, E3 v1, T-OUT-2027 v1

  • Supported by evidence

    In 2026, 15% of the electricity we bought was renewable, by our supplier’s disclosed fuel mix.

    Rests on: T-ENERGY-2026 v1

  • Supported by evidence

    The Gdańsk workshop uses no natural gas: all 612 MWh of gas in 2027 was used at the Aarhus plant.

    Rests on: E2 v1

  • Not published: gap

    Renewable share of all the energy we use.

    The records cover purchased electricity only; gas, fuel and on-site generation are not yet covered.

Rules for these statements: Directive (EU) 2024/825 for consumer-facing claims; Directive 2006/114/EC for business-to-business communication.

Shared from the same records

Shared with the customer

Brakvold Machines, questionnaire, Q4

Total energy consumption, 2027: 1,912 MWh, from E1 v2, E2 v1, E3 v1.

See this step in the demo

Shared with the lender

Halvorne Bank, KPI K1 report

Energy intensity, 2027: 1.80 MWh per tonne, with its method and records, in the Annual KPI Evidence Pack FY2027 v1 of 28 March 2028.

See this step in the demo

Report

Voluntary Standard report

Energy consumption (Annex I, paragraph 32, first sentence): 1,912 MWh for 2027, from the same records as the K1 numerator.

See this step in the demo

Updates

Tracked and updated continuously

  1. Record updated: Electricity invoices, 2027 (E1), version 3. The utility re-billed March 2027 after a meter fault.
  2. Figure recalculated: energy intensity, 2027, is 1.81 MWh per tonne from the updated electricity invoices; the published 1.80 stays until the new value is approved.
  3. Annual KPI Evidence Pack FY2027 v1 issued to Halvorne Bank.
  4. Approval recorded: Energy intensity, 2027, approved for publication by the CFO.
  5. Record updated: Electricity invoices, 2027 (E1), version 2. Final December invoice received.
  6. Record added: Production ledger, 2027 (T-OUT-2027). Year-end close.
  7. Record added: Gas invoices, 2027 (E2). Four quarterly invoices.
  8. Record added: Electricity invoices, 2027 (E1). November and December estimated by the utility.
  9. Record added: Fuel log, 2027 (E3). Year-end total.
  10. Verification report attached: DV-2027-112, limited assurance on the 2026 values of both KPIs, by an external verifier.
  11. Approval recorded: Energy intensity, 2026, approved for publication by the CFO.
  12. Approval recorded: Renewable share of purchased electricity, 2026, approved for publication by the CFO.
  13. Record added: Energy summary, 2026 (T-ENERGY-2026). From the 2026 invoices and fuel log.
  14. Method change recorded: Renewable share of purchased electricity, from FY2027: method: unbundled certificates excluded; approved by the CFO.
  15. Record added: Production ledger, 2026 (T-OUT-2026). Year-end close.
  16. Record added: Energy summary, 2025 (baseline year) (T-ENERGY-2025). From the 2025 invoices and fuel log.
  17. Record added: Production ledger, 2025 (T-OUT-2025). Year-end close.

Published by Tindrevik Components with Sustin · Figures approved by the CFO, 25 March 2028 · Demo, fictional data