Energy intensity
At most 1.85 MWh per tonne of finished parts by 2027
Target met: 1.80 in 2027- Target
- at most 1.85 MWh per tonne of finished parts in 2027; later targets at most 1.75 in 2028 and at most 1.70 in 2029
- Deadline
- Financial year 2027; reported annually, by 31 March after each financial year, to Halvorne Bank
- Plan
- Recover heat from the Aarhus press line and cover a quarter of the Aarhus plant’s electricity with the solar roof; the solar roof and the heat recovery pilot are paid from the company’s own budget; run by the plant manager and a part-time energy coordinator.
- How progress is measured
- Energy consumed at both sites and by company vehicles and forklifts, per tonne of finished parts produced. Numerator: Energy consumed (MWh): electricity (invoices) + natural gas (invoices) + fuel energy equivalent (fuel log). Denominator: Finished parts produced (t), from the ERP production ledger. Boundary: Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts.
- Verification
- KPI K1 is checked annually by an external verifier under the loan agreement; the verification report is held by the lender. For 2026: limited assurance on the 2026 values of both KPIs, report DV-2027-112, 20 April 2027.