  "label": "Demo, fictional data",
  "id": "KPI-PACK-FY2027",
  "version": 1,
  "issued": "2028-03-28",
  "year": 2027,
  "borrower": "Tindrevik Components",
  "lender": "Halvorne Bank",
  "instrument": {
    "id": "SLL-2026",
    "type": "Sustainability-linked loan",
    "borrower": "tindrevik",
    "lender": "halvorne",
    "facility": "EUR 8 million revolving credit facility (fictional)",
    "signed": "2026-03-16",
    "reporting": "Annually, by 31 March after each financial year, to Halvorne Bank",
    "consequence": "A margin adjustment per KPI as set in the facility agreement (recorded as text; not calculated by Sustin)",
    "verification": "Annual external verification of the KPI values by a qualified third party, as agreed in the facility",
    "verificationReport": "held by the lender",
    "frameworks": [
      {
        "provision": "P-SLLP",
        "edition": "ED-SLLP-2025",
        "title": "Sustainability-Linked Loan Principles, March 2025"
      }
    ]
  },
  "note": "Prepared by Sustin from the borrower's records and approved by the borrower. Each verification statement comes from an attached third-party report; Sustin tracks the verification status of every value. Who does what: sustin.ai/method#roles.",
  "evidenceVersions": {
    "E1": 2,
    "E2": 1,
    "E3": 1,
    "E4": 1,
    "E5": 1,
    "T-OUT-2025": 1,
    "T-OUT-2026": 1,
    "T-OUT-2027": 1,
    "T-ENERGY-2025": 1,
    "T-ENERGY-2026": 1
  },
  "kpis": [
    {
      "id": "K1",
      "name": "Energy intensity",
      "unit": "MWh per tonne of finished parts",
      "definition": "Energy consumed at both sites and by company vehicles and forklifts, per tonne of finished parts produced.",
      "boundary": "Tindrevik Components: Aarhus plant, Gdańsk workshop, company vehicles and forklifts",
      "numerator": "Energy consumed (MWh): electricity (invoices) + natural gas (invoices) + fuel energy equivalent (fuel log)",
      "denominator": "Finished parts produced (t), from the ERP production ledger",
      "method": null,
      "targets": [
        {
          "year": 2027,
          "value": 1.85,
          "text": "at most 1.85"
        },
        {
          "year": 2028,
          "value": 1.75,
          "text": "at most 1.75"
        },
        {
          "year": 2029,
          "value": 1.7,
          "text": "at most 1.70"
        }
      ],
      "history": [
        {
          "kpi": "K1",
          "year": 2025,
          "value": 2.09,
          "text": "2.09 MWh per tonne of finished parts",
          "tier": "public",
          "sources": [
            {
              "record": "T-ENERGY-2025",
              "version": 1,
              "date": "2026-02-10"
            },
            {
              "record": "T-OUT-2025",
              "version": 1,
              "date": "2026-01-14"
            }
          ],
          "steps": [
            "Energy: 2,046 MWh (T-ENERGY-2025 v1) = 2,046 MWh",
            "Output: 980 t (T-OUT-2025 v1)",
            "2,046 / 980 = 2.09 MWh per tonne of finished parts"
          ],
          "verification": {
            "state": "not-verified",
            "text": "Not verified: no verification record attached"
          },
          "baseline": true,
          "target": null,
          "met": null
        },
        {
          "kpi": "K1",
          "year": 2026,
          "value": 1.95,
          "text": "1.95 MWh per tonne of finished parts",
          "tier": "public",
          "approved": "2027-03-20",
          "sources": [
            {
              "record": "T-ENERGY-2026",
              "version": 1,
              "date": "2027-02-08"
            },
            {
              "record": "T-OUT-2026",
              "version": 1,
              "date": "2027-01-15"
            }
          ],
          "steps": [
            "Energy: 1,978 MWh (T-ENERGY-2026 v1) = 1,978 MWh",
            "Output: 1,016 t (T-OUT-2026 v1)",
            "1,978 / 1,016 = 1.95 MWh per tonne of finished parts"
          ],
          "verification": {
            "state": "externally-verified",
            "text": "Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)",
            "record": "VR-2026"
          },
          "baseline": false,
          "target": null,
          "met": null
        },
        {
          "kpi": "K1",
          "year": 2027,
          "value": 1.8,
          "text": "1.80 MWh per tonne of finished parts",
          "tier": "public",
          "approved": "2028-03-25",
          "sources": [
            {
              "record": "E1",
              "version": 2,
              "date": "2028-02-03"
            },
            {
              "record": "E2",
              "version": 1,
              "date": "2028-01-20"
            },
            {
              "record": "E3",
              "version": 1,
              "date": "2028-01-08"
            },
            {
              "record": "T-OUT-2027",
              "version": 1,
              "date": "2028-01-25"
            }
          ],
          "steps": [
            "Energy: 1,184 MWh (E1 v2) + 612 MWh (E2 v1) + 116 MWh (E3 v1) = 1,912 MWh",
            "Output: 1,062 t (T-OUT-2027 v1)",
            "1,912 / 1,062 = 1.80 MWh per tonne of finished parts"
          ],
          "verification": {
            "state": "not-verified",
            "text": "Not verified: no verification record attached"
          },
          "baseline": false,
          "target": "at most 1.85",
          "met": true
        }
      ],
      "changes": [],
      "registry": [
        {
          "provision": "P-VS-B3-32S1",
          "note": "Energy consumption (numerator only); a mapping shows where the concept appears, never compliance"
        }
      ]
    },
    {
      "id": "K2",
      "name": "Renewable share of purchased electricity",
      "unit": "%",
      "definition": "Purchased electricity covered by the supplier's disclosed renewable fuel mix for the supply contract, as a share of purchased electricity (MWh).",
      "boundary": "Electricity purchased for both sites",
      "numerator": "Purchased electricity covered by the supplier's renewable fuel mix (MWh)",
      "denominator": "Purchased electricity (MWh)",
      "method": "Market-based: the supplier's fuel-mix disclosure for the contract; unbundled certificates excluded",
      "targets": [
        {
          "year": 2027,
          "value": 20,
          "text": "at least 20%"
        },
        {
          "year": 2028,
          "value": 30,
          "text": "at least 30%"
        },
        {
          "year": 2029,
          "value": 40,
          "text": "at least 40%"
        }
      ],
      "history": [
        {
          "kpi": "K2",
          "year": 2025,
          "value": 12,
          "text": "12%",
          "tier": "public",
          "sources": [
            {
              "record": "T-ENERGY-2025",
              "version": 1,
              "date": "2026-02-10"
            }
          ],
          "steps": [
            "12% from T-ENERGY-2025 v1 (Market-based: the supplier's fuel-mix disclosure for the contract; unbundled certificates excluded)"
          ],
          "verification": {
            "state": "not-verified",
            "text": "Not verified: no verification record attached"
          },
          "baseline": true,
          "target": null,
          "met": null
        },
        {
          "kpi": "K2",
          "year": 2026,
          "value": 15,
          "text": "15%",
          "tier": "public",
          "approved": "2027-03-20",
          "sources": [
            {
              "record": "T-ENERGY-2026",
              "version": 1,
              "date": "2027-02-08"
            }
          ],
          "steps": [
            "15% from T-ENERGY-2026 v1 (Market-based: the supplier's fuel-mix disclosure for the contract; unbundled certificates excluded)"
          ],
          "verification": {
            "state": "externally-verified",
            "text": "Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs)",
            "record": "VR-2026"
          },
          "baseline": false,
          "target": null,
          "met": null
        },
        {
          "kpi": "K2",
          "year": 2027,
          "value": 18,
          "text": "18%",
          "tier": "lender",
          "approved": "2028-03-25",
          "sources": [
            {
              "record": "E1",
              "version": 2,
              "date": "2028-02-03"
            }
          ],
          "steps": [
            "18% from E1 v2 (Market-based: the supplier's fuel-mix disclosure for the contract; unbundled certificates excluded)"
          ],
          "verification": {
            "state": "not-verified",
            "text": "Not verified: no verification record attached"
          },
          "baseline": false,
          "target": "at least 20%",
          "met": false
        }
      ],
      "changes": [
        {
          "date": "2027-02-01",
          "effective": "FY2027",
          "change": "Method: unbundled certificates excluded",
          "reason": "Aligned with the definition agreed with Halvorne Bank; no certificates were bought in 2025 or 2026, so earlier values are unchanged",
          "approvedBy": "Tindrevik Components, CFO"
        }
      ],
      "registry": [
        {
          "provision": "P-VS-B3-32S2",
          "note": "Renewable and non-renewable energy: a different scope (all energy), shown to flag the difference"
        }
      ]
    }
  ],
  "verification": [
    {
      "id": "VR-2026",
      "by": "Demo verifier (fictional), independent third party",
      "date": "2027-04-20",
      "report": "DV-2027-112",
      "scope": "Limited assurance on the 2026 values of both KPIs",
      "covers": [
        "K1:2026",
        "K2:2026"
      ]
    }
  ]
}