Annual KPI Evidence Pack Demo, fictional data
Tindrevik Components: KPI evidence, financial year 2027
Demo, fictional data. Prepared by Sustin from the borrower's records and approved by the borrower. Each verification statement comes from an attached third-party report; Sustin tracks the verification status of every value. Who does what: sustin.ai/method#roles.
Energy intensity
| Year | Value | Target | Against target | Sources | Verification |
|---|---|---|---|---|---|
| 2025 (baseline) | 2.09 MWh per tonne of finished parts | – | – | T-ENERGY-2025 v1 T-OUT-2025 v1 | Not verified: no verification record attached |
| 2026 | 1.95 MWh per tonne of finished parts | – | – | T-ENERGY-2026 v1 T-OUT-2026 v1 | Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs) |
| 2027 | 1.80 MWh per tonne of finished parts | at most 1.85 | Met | E1 v2 E2 v1 E3 v1 T-OUT-2027 v1 | Not verified: no verification record attached |
Renewable share of purchased electricity
| Year | Value | Target | Against target | Sources | Verification |
|---|---|---|---|---|---|
| 2025 (baseline) | 12% | – | – | T-ENERGY-2025 v1 | Not verified: no verification record attached |
| 2026 | 15% | – | – | T-ENERGY-2026 v1 | Externally verified: Demo verifier (fictional), independent third party, 2027-04-20, report DV-2027-112 (Limited assurance on the 2026 values of both KPIs) |
| 2027 | 18% | at least 20% | Not met | E1 v2 | Not verified: no verification record attached |
Newer evidence since issue: E1 v3 (2028-04-02: The utility re-billed March 2027 after a meter fault); the pack stays on v2. A correction would be issued as version 2 of the pack.
Structured data: /demo/kpi-pack.json. Walk-through: /demo.