Company
Tindrevik Components
A supplier of machined metal parts that publishes its figures, its targets and the records behind them.
Fictional · AI imagesust.in/tindrevik-components sustin.ai/org/tindrevik-components · Short links open with the sust.in migration
Sample: a fictional organisation and its fictional records, from the worked example.
- Last updated 2 September 2028
- 3 of 5 milestones reported
- All 9 figures linked to records
- 2 SDG targets, each with baseline and evidence route
- 3 dated progress updates
Opens your browser’s print dialog.
Objectives
- Measure energy use at both sites from invoices and logs, every year.
- Cover a quarter of the Aarhus plant’s electricity with the solar roof.
- Recover heat from the Aarhus press line.
- Record every work accident at both sites and act on each one.
Figures at a glance
Goals and progress
Fictional · AI image The east roof (illustration). Our target In progressCover a quarter of the Aarhus plant’s electricity with the solar roof. Progress at September 2028Panels connected on 2 September 2028; monthly export-meter readings since then. The share is not yet measured over a full year.- Our target In progressRecover heat from the Aarhus press line. Progress at April 2028Pilot started on 22 April 2028; results are measured over the 2028 heating season.
Energy and climate
4 figures, each with its record, period and scope. 2 targets with progress.
Our workforce
3 figures, each with its record, period and scope. No target recorded for this topic yet.
Health and safety
2 figures, each with its record, period and scope. No target recorded for this topic yet.
SDG targets
-
SDG target 7.2 In progress
A solar roof on the Aarhus plant, to cover a quarter of the plant’s electricity.
- Baseline
- Renewable share of purchased electricity for 2027: pending publication (shared with the lender, not yet approved for publication); no own generation
- Responsible
- Plant manager, Aarhus
- Evidence
- Electricity invoices and the export meter of the solar roof, read monthly
-
SDG target 8.8 In progress
Every work accident at both sites is recorded and followed up.
- Baseline
- 3 recordable work accidents in 2027, employees at both sites
- Responsible
- Health and safety lead
- Evidence
- Accident register
SDG targets as the organisation states its contribution, each with its baseline, who is responsible and the record that shows progress. Identifiers only; the UN’s texts are not reproduced. No affiliation with the United Nations.
Milestones
- 14 February 2028Energy records for 2027 completeReached
- 22 April 2028Heat recovery pilot started on the press lineReached
- 2 September 2028Solar roof panels connectedReached
- March 2029Energy records for 2028 completePlanned
- September 2029First full year of solar readingsPlanned
Who benefits
- 64Employees at both sitesRecord: HR headcount export
Progress updates
- 22 April 2028Heat recovery on the Aarhus press linePilot started; results are measured over the 2028 heating season.
- 3 March 2028Response sent to Brakvold MachinesSupplier response pack for FY2027, with the evidence behind each answer.
- 14 February 2028Energy records for 2027 completeElectricity, gas and fuel records for both sites add up to 1,912 MWh.
Resources
- Funding
- The solar roof and the heat recovery pilot are paid from the company’s own budget.
- People
- The plant manager and a part-time energy coordinator.
Partners
- Fjordlys InstallersInstalled the solar roof
- A partnerStructural survey of the east roof
Partners are named with their recorded consent only; the others are shown by their role.
Where
Two sites: Aarhus, Denmark, and Gdańsk, Poland
- Aarhus plant
- Gdańsk workshop
Frameworks referenced
- Voluntary Standard
- GRI Topic Standards
Referenced by the organisation. Referencing a framework is not a statement that it is met.
Contact
Sustainability contact, Tindrevik Components [email protected]
Data and framework index
| ID | Figure | Value | Period | Scope | Record | Framework reference |
|---|---|---|---|---|---|---|
| F1 | Energy used | 1,912 MWh | Jan to Dec 2027 | Both sites, vehicles and forklifts | Electricity and gas invoices, fuel log | Voluntary Standard B3 paragraph 32, first sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1 |
| F2 | Electricity | 1,184 MWh | Jan to Dec 2027 | Both sites | Electricity invoices | Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1 |
| F3 | Natural gas | 612 MWh | Jan to Dec 2027 | Aarhus plant | Gas invoices | Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1 |
| F4 | Diesel | 116 MWh | Jan to Dec 2027 | Vehicles and forklifts, 11,600 litres | Fuel log | Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1 |
| F5 | Employees | 64 | Headcount at 31 Dec 2027 | All employees, both sites | HR headcount export | Voluntary Standard B8 paragraph 40, point (a); GRI Universal Standards 2021 Disclosure 2-7 |
| F6 | On permanent contracts | 58 | Headcount at 31 Dec 2027 | All employees; 6 on temporary contracts | HR headcount export | Voluntary Standard B8 paragraph 40, point (a); GRI Universal Standards 2021 Disclosure 2-7 |
| F7 | Training per employee | 14 hours | Jan to Dec 2027 | All employees; 896 hours in total | HR headcount export | Voluntary Standard B10 paragraph 42, point (d) |
| F8 | Recordable work accidents | 3 | Jan to Dec 2027 | Employees at both sites; contractors not recorded | Accident register | Voluntary Standard B9 paragraph 41, point (a); GRI Topic Standards Disclosure 403-9 |
| F9 | Fatalities from work injuries | 0 | Jan to Dec 2027 | Employees at both sites | Accident register | Voluntary Standard B9 paragraph 41, point (b); GRI Topic Standards Disclosure 403-9 |
| Figure | Voluntary Standard | Related provisions in other frameworks |
|---|---|---|
| Energy used F1 | B3 paragraph 32, first sentenceTotal energy consumption in MWh |
|
| Electricity F2 | B3 paragraph 32, second sentenceBreakdown of energy consumption (renewable / non-renewable; electricity / fuels) |
|
| Natural gas F3 | B3 paragraph 32, second sentenceBreakdown of energy consumption (renewable / non-renewable; electricity / fuels) |
|
| Diesel F4 | B3 paragraph 32, second sentenceBreakdown of energy consumption (renewable / non-renewable; electricity / fuels) |
|
| Employees F5 | B8 paragraph 40, point (a)Number of employees by type of employment contract (temporary or permanent) |
|
| On permanent contracts F6 | B8 paragraph 40, point (a)Number of employees by type of employment contract (temporary or permanent) |
|
| Training per employee F7 | B10 paragraph 42, point (d)Average number of annual training hours per employee | No reviewed relationship to another framework in this release. |
| Recordable work accidents F8 | B9 paragraph 41, point (a)Number and rate of recordable work-related accidents |
|
| Fatalities from work injuries F9 | B9 paragraph 41, point (b)Fatalities from recordable work-related accidents and work-related ill health |
|
From the reviewed mappings of Sustin release 2026.6. A relationship shows that two provisions concern the same concept, not that one answer satisfies both. Identifiers only; the frameworks' own texts are not reproduced.
About these figures
- Period
- Financial year 2027, 1 January to 31 December 2027; headcount at 31 December 2027. Renewable share of purchased electricity for 2027: pending publication (shared with the lender, not yet approved).
- Boundary
- Tindrevik Components: the Aarhus plant and the Gdańsk workshop, with company vehicles and forklifts. Gas is used at Aarhus only; contractors are not in the accident figures.
- Method
- Totals of our own records: electricity and gas invoices, the fuel log (diesel as energy, as recorded in the log), the HR headcount export and the accident register. Training per employee: 896 hours divided by 64 employees. Greenhouse gas emissions are not shown: the 2027 calculation is not complete. 2027 is the first year of these records, so there is no prior-year comparison.
- Records
- Electricity and gas invoices, fuel log; Electricity invoices; Gas invoices; Fuel log; HR headcount export; Accident register
- Status
- Self-reported. The figures come from Tindrevik Components’s own records and have not been checked by Sustin unless marked otherwise. No figure is a score, rating or label.
- Made with
- Sustin, release 2026.6 of 28 October 2026. Framework references from the release’s reviewed mappings.
Framework alignment
Frameworks likely to concern this site, from its country, size band and value-chain role, checked against Sustin release 2026.6 on 2026-10-28. This is guidance, not legal advice or a compliance assessment.
-
Corporate Sustainability Due Diligence Directive
EU · Applicable in release 2026.6 · checked 2026-10-28
- Draft guidance Companies in scope may ask their business partners for information for their in-depth assessment, only where it is necessary, and from partners with fewer than 5,000 employees only where it cannot reasonably be obtained otherwise. Suppliers of such companies may receive these requests wherever they are established. Source: Directive (EU) 2024/1760, Article 8(2a), point (a), as inserted by Directive (EU) 2026/470, Article 4, point (6)(b)
-
Empowering Consumers for the Green Transition Directive
EU · Applicable in release 2026.6 · checked 2026-10-28
- Draft guidance Rules on environmental claims made to consumers apply from 27 September 2026 through national law. Relevant to any trader making environmental claims to consumers in the EU, including on its living site. Source: Directive (EU) 2024/825, Article 4(1); definition of environmental claim in Directive 2005/29/EC, Article 2, point (o), as added by Article 1
-
Voluntary Standard
EFRAG VSME basis · EU · Applicable in release 2026.6 · checked 2026-10-28
- Draft guidance An undertaking with 1,000 employees or fewer in the value chain of an EU reporting undertaking is a protected undertaking: it may decline requests for information beyond the voluntary standards, and contracts may not require more. The registry records the EFRAG VSME and the Commission Recommendation of 30 July 2025 as the basis of the voluntary standard. Applies wherever the supplier is established. Source: Directive 2013/34/EU, Article 19a(3), as amended by Directive (EU) 2026/470, Article 2, point (4)(b); voluntary standards under Article 29ca
- Chosen by the site owner as a framework of interest.
-
GRI Topic Standards
Global · Applicable in release 2026.6 · checked 2026-10-28
- Chosen by the site owner as a framework of interest.
Industry 5.0 readiness
Planned (i5Benchmark method, pilot, self-assessed). No scores, badges or rankings are shown.