Templates · Sustainability deck (10 slides)

Sustainability deck (10 slides) in Bold data

Numbers first: very large figures, heavy display type and a mono face for units, on near-black with lime and white.

Typography
Inter Tight at 800, JetBrains Mono for units and labels
Colour
Near-black, lime and white
Grid
12 columns, full-width figure bands
Charts
Thick bars and large percentages
Photographs
Duotone in the family colours

Sustainability · Financial year 2027

Tindrevik Components

Metal parts for machine builders, made at our Aarhus plant and Gdańsk workshop.

Fictional · AI image
Tindrevik Components · Sustainability · Financial year 20271 / 10

At a glance

Our year in figures

1,912MWhEnergy used F1Jan to Dec 2027 · Both sites, vehicles and forkliftsRecord: Electricity and gas invoices, fuel log
64Employees F5Headcount at 31 Dec 2027 · All employees, both sitesRecord: HR headcount export
14hoursTraining per employee F7Jan to Dec 2027 · All employees; 896 hours in totalRecord: HR headcount export
3Recordable work accidents F8Jan to Dec 2027 · Employees at both sites; contractors not recordedRecord: Accident register
Tindrevik Components · Sustainability · Financial year 20272 / 10

Energy and climate

Where our energy comes from

1,912MWhEnergy used F1Jan to Dec 2027 · Both sites, vehicles and forkliftsRecord: Electricity and gas invoices, fuel log
1,184MWhElectricity F2Jan to Dec 2027 · Both sitesRecord: Electricity invoices
612MWhNatural gas F3Jan to Dec 2027 · Aarhus plantRecord: Gas invoices
  • 1,184MWh Electricity F2 62%
  • 612MWh Natural gas F3 32%
  • 116MWh Diesel F4 6%
Energy used: 1,912 MWh F1 · Jan to Dec 2027
Tindrevik Components · Sustainability · Financial year 20273 / 10

Our workforce

Our people

64Employees F5Headcount at 31 Dec 2027 · All employees, both sitesRecord: HR headcount export
58On permanent contracts F6Headcount at 31 Dec 2027 · All employees; 6 on temporary contractsRecord: HR headcount export
14hoursTraining per employee F7Jan to Dec 2027 · All employees; 896 hours in totalRecord: HR headcount export
Fictional · AI image In the workshop (illustration).
Tindrevik Components · Sustainability · Financial year 20275 / 10

Health and safety

Health and safety

3Recordable work accidents F8Jan to Dec 2027 · Employees at both sites; contractors not recordedRecord: Accident register
0Fatalities from work injuries F9Jan to Dec 2027 · Employees at both sitesRecord: Accident register
Tindrevik Components · Sustainability · Financial year 20276 / 10

Goals and progress

What we set out to do

  1. Our target In progressCover a quarter of the Aarhus plant’s electricity with the solar roof. Progress at September 2028Panels connected on 2 September 2028; monthly export-meter readings since then. The share is not yet measured over a full year.
  2. Our target In progressRecover heat from the Aarhus press line. Progress at April 2028Pilot started on 22 April 2028; results are measured over the 2028 heating season.
Tindrevik Components · Sustainability · Financial year 20277 / 10

Milestones

The year, step by step

  1. Energy records for 2027 completeElectricity, gas and fuel records for both sites add up to 1,912 MWh.
  2. Response sent to Brakvold MachinesSupplier response pack for FY2027, with the evidence behind each answer.
  3. Heat recovery on the Aarhus press linePilot started; results are measured over the 2028 heating season.
Tindrevik Components · Sustainability · Financial year 20278 / 10

Framework index

Where each figure fits

  • Energy used F1Voluntary Standard B3 paragraph 32, first sentence · GRI Topic Standards Disclosure 103-2 · GRI Topic Standards Disclosure 302-1
  • Electricity F2, Natural gas F3, Diesel F4Voluntary Standard B3 paragraph 32, second sentence · GRI Topic Standards Disclosure 103-2 · GRI Topic Standards Disclosure 302-1
  • Employees F5, On permanent contracts F6Voluntary Standard B8 paragraph 40, point (a) · GRI Universal Standards 2021 Disclosure 2-7
  • Training per employee F7Voluntary Standard B10 paragraph 42, point (d)
  • Recordable work accidents F8Voluntary Standard B9 paragraph 41, point (a) · GRI Topic Standards Disclosure 403-9
  • Fatalities from work injuries F9Voluntary Standard B9 paragraph 41, point (b) · GRI Topic Standards Disclosure 403-9

From the reviewed mappings of Sustin release 2026.6; identifiers only.

Tindrevik Components · Sustainability · Financial year 20279 / 10

About these figures

Period, boundary and method

Period
Financial year 2027, 1 January to 31 December 2027; headcount at 31 December 2027. Renewable share of purchased electricity for 2027: pending publication (shared with the lender, not yet approved).
Boundary
Tindrevik Components: the Aarhus plant and the Gdańsk workshop, with company vehicles and forklifts. Gas is used at Aarhus only; contractors are not in the accident figures.
Method
Totals of our own records: electricity and gas invoices, the fuel log (diesel as energy, as recorded in the log), the HR headcount export and the accident register. Training per employee: 896 hours divided by 64 employees. Greenhouse gas emissions are not shown: the 2027 calculation is not complete. 2027 is the first year of these records, so there is no prior-year comparison.
Status
Self-reported. The figures come from Tindrevik Components’s own records and have not been checked by Sustin unless marked otherwise. No figure is a score, rating or label.
Tindrevik Components · Sustainability · Financial year 202710 / 10

Figures

IDFigureValuePeriodScopeRecordFramework reference
F1Energy used1,912 MWhJan to Dec 2027Both sites, vehicles and forkliftsElectricity and gas invoices, fuel log Voluntary Standard B3 paragraph 32, first sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F2Electricity1,184 MWhJan to Dec 2027Both sitesElectricity invoices Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F3Natural gas612 MWhJan to Dec 2027Aarhus plantGas invoices Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F4Diesel116 MWhJan to Dec 2027Vehicles and forklifts, 11,600 litresFuel log Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F5Employees64Headcount at 31 Dec 2027All employees, both sitesHR headcount export Voluntary Standard B8 paragraph 40, point (a); GRI Universal Standards 2021 Disclosure 2-7
F6On permanent contracts58Headcount at 31 Dec 2027All employees; 6 on temporary contractsHR headcount export Voluntary Standard B8 paragraph 40, point (a); GRI Universal Standards 2021 Disclosure 2-7
F7Training per employee14 hoursJan to Dec 2027All employees; 896 hours in totalHR headcount export Voluntary Standard B10 paragraph 42, point (d)
F8Recordable work accidents3Jan to Dec 2027Employees at both sites; contractors not recordedAccident register Voluntary Standard B9 paragraph 41, point (a); GRI Topic Standards Disclosure 403-9
F9Fatalities from work injuries0Jan to Dec 2027Employees at both sitesAccident register Voluntary Standard B9 paragraph 41, point (b); GRI Topic Standards Disclosure 403-9

Every figure carries an ID (F1, F2 …) that leads to the data table with its record, period and scope. Framework references come from the reviewed mappings of the pinned release; the frameworks' own texts are not reproduced. Self-reported: Sustin has not checked these figures. All six style families: Editorial, Corporate clean, Bold data, Nature photography, Civic, Minimal.

All templates