Explore · Sample living site

Tindrevik Components in Bold data

A structured record with a showcase on top: summary, objectives, SDG targets, milestones, partners and places, each figure with its record, period and scope.

SampleFictional organisation and data

See it in Corporate cleanExport the recordMake yours

Style family
Bold data: Inter Tight at 800, JetBrains Mono for units and labels
Motion
Photo hero, Figures count up, Timeline fills, Map pins. Nothing moves when your device asks for reduced motion.

Company

Tindrevik Components

A supplier of machined metal parts that publishes its figures, its targets and the records behind them.

Fictional · AI image

sust.in/tindrevik-components sustin.ai/org/tindrevik-components · Short links open with the sust.in migration

Sample: a fictional organisation and its fictional records.

  • Last updated 2 September 2028
  • 3 of 5 milestones reported
  • All 9 figures linked to records
  • 2 SDG targets, each with baseline and evidence route
  • 3 dated progress updates

Opens your browser’s print dialog.

Objectives

  1. Measure energy use at both sites from invoices and logs, every year.
  2. Cover a quarter of the Aarhus plant’s electricity with the solar roof.
  3. Recover heat from the Aarhus press line.
  4. Record every work accident at both sites and act on each one.

Figures at a glance

1,912MWhEnergy used F1Jan to Dec 2027 · Both sites, vehicles and forkliftsRecord: Electricity and gas invoices, fuel log
64Employees F5Headcount at 31 Dec 2027 · All employees, both sitesRecord: HR headcount export
14hoursTraining per employee F7Jan to Dec 2027 · All employees; 896 hours in totalRecord: HR headcount export
3Recordable work accidents F8Jan to Dec 2027 · Employees at both sites; contractors not recordedRecord: Accident register

Goals and progress

  1. Our target In progressCover a quarter of the Aarhus plant’s electricity with the solar roof. Progress at September 2028Panels connected on 2 September 2028; monthly export-meter readings since then. The share is not yet measured over a full year.
  2. Our target In progressRecover heat from the Aarhus press line. Progress at April 2028Pilot started on 22 April 2028; results are measured over the 2028 heating season.

Energy and climate

4 figures, each with its record, period and scope. 2 targets with progress.

1,912MWhEnergy used F1Jan to Dec 2027 · Both sites, vehicles and forkliftsRecord: Electricity and gas invoices, fuel log
1,184MWhElectricity F2Jan to Dec 2027 · Both sitesRecord: Electricity invoices
612MWhNatural gas F3Jan to Dec 2027 · Aarhus plantRecord: Gas invoices
116MWhDiesel F4Jan to Dec 2027 · Vehicles and forklifts, 11,600 litresRecord: Fuel log
  • 1,184MWh Electricity F2 62%
  • 612MWh Natural gas F3 32%
  • 116MWh Diesel F4 6%
Energy used: 1,912 MWh F1 · Jan to Dec 2027

Our workforce

3 figures, each with its record, period and scope. No target recorded for this topic yet.

64Employees F5Headcount at 31 Dec 2027 · All employees, both sitesRecord: HR headcount export
58On permanent contracts F6Headcount at 31 Dec 2027 · All employees; 6 on temporary contractsRecord: HR headcount export
14hoursTraining per employee F7Jan to Dec 2027 · All employees; 896 hours in totalRecord: HR headcount export

Health and safety

2 figures, each with its record, period and scope. No target recorded for this topic yet.

3Recordable work accidents F8Jan to Dec 2027 · Employees at both sites; contractors not recordedRecord: Accident register
0Fatalities from work injuries F9Jan to Dec 2027 · Employees at both sitesRecord: Accident register

SDG targets

  • SDG target 7.2 In progress

    A solar roof on the Aarhus plant, to cover a quarter of the plant’s electricity.

    Baseline
    Renewable share of purchased electricity for 2027: pending publication (shared with the lender, not yet approved for publication); no own generation
    Responsible
    Plant manager, Aarhus
    Evidence
    Electricity invoices and the export meter of the solar roof, read monthly
  • SDG target 8.8 In progress

    Every work accident at both sites is recorded and followed up.

    Baseline
    3 recordable work accidents in 2027, employees at both sites
    Responsible
    Health and safety lead
    Evidence
    Accident register

SDG targets as the organisation states its contribution, each with its baseline, who is responsible and the record that shows progress. Identifiers only; the UN’s texts are not reproduced. No affiliation with the United Nations.

Milestones

  1. 14 February 2028Energy records for 2027 completeReached
  2. 22 April 2028Heat recovery pilot started on the press lineReached
  3. 2 September 2028Solar roof panels connectedReached
  4. March 2029Energy records for 2028 completePlanned
  5. September 2029First full year of solar readingsPlanned

Who benefits

  • 64Employees at both sitesHeadcount at 31 Dec 2027Record: HR headcount export

Progress updates

  1. 22 April 2028Heat recovery on the Aarhus press linePilot started; results are measured over the 2028 heating season.
  2. 3 March 2028Response sent to Brakvold MachinesSupplier response pack for FY2027, with the evidence behind each answer.
  3. 14 February 2028Energy records for 2027 completeElectricity, gas and fuel records for both sites add up to 1,912 MWh.

Resources

Funding
The solar roof and the heat recovery pilot are paid from the company’s own budget.
People
The plant manager and a part-time energy coordinator.

Partners

  • Fjordlys InstallersInstalled the solar roof
  • A partnerStructural survey of the east roof

Partners are named with their recorded consent only; the others are shown by their role.

Where

Two sites: Aarhus, Denmark, and Gdańsk, Poland

  • Aarhus plant 56.16, 10.21
  • Gdańsk workshop 54.35, 18.65
Map: Natural Earth, public domain.

Frameworks referenced

  • Voluntary Standard
  • GRI Topic Standards

Referenced by the organisation. Referencing a framework is not a statement that it is met.

Contact

Sustainability contact, Tindrevik Components [email protected]

Data and framework index

IDFigureValuePeriodScopeRecordFramework reference
F1Energy used1,912 MWhJan to Dec 2027Both sites, vehicles and forkliftsElectricity and gas invoices, fuel log Voluntary Standard B3 paragraph 32, first sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F2Electricity1,184 MWhJan to Dec 2027Both sitesElectricity invoices Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F3Natural gas612 MWhJan to Dec 2027Aarhus plantGas invoices Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F4Diesel116 MWhJan to Dec 2027Vehicles and forklifts, 11,600 litresFuel log Voluntary Standard B3 paragraph 32, second sentence; GRI Topic Standards Disclosure 103-2; GRI Topic Standards Disclosure 302-1
F5Employees64Headcount at 31 Dec 2027All employees, both sitesHR headcount export Voluntary Standard B8 paragraph 40, point (a); GRI Universal Standards 2021 Disclosure 2-7
F6On permanent contracts58Headcount at 31 Dec 2027All employees; 6 on temporary contractsHR headcount export Voluntary Standard B8 paragraph 40, point (a); GRI Universal Standards 2021 Disclosure 2-7
F7Training per employee14 hoursJan to Dec 2027All employees; 896 hours in totalHR headcount export Voluntary Standard B10 paragraph 42, point (d)
F8Recordable work accidents3Jan to Dec 2027Employees at both sites; contractors not recordedAccident register Voluntary Standard B9 paragraph 41, point (a); GRI Topic Standards Disclosure 403-9
F9Fatalities from work injuries0Jan to Dec 2027Employees at both sitesAccident register Voluntary Standard B9 paragraph 41, point (b); GRI Topic Standards Disclosure 403-9
FigureVoluntary StandardRelated provisions in other frameworks
Energy used F1B3 paragraph 32, first sentenceTotal energy consumption in MWh
  • GRI Topic Standards Disclosure 103-2 through the concept “Total energy consumption”
  • GRI Topic Standards Disclosure 302-1 through the concept “Total energy consumption”
Electricity F2B3 paragraph 32, second sentenceBreakdown of energy consumption (renewable / non-renewable; electricity / fuels)
  • GRI Topic Standards Disclosure 103-2 through the concept “Energy consumption by renewable and non-renewable source”
  • GRI Topic Standards Disclosure 302-1 through the concept “Energy consumption by renewable and non-renewable source”
Natural gas F3B3 paragraph 32, second sentenceBreakdown of energy consumption (renewable / non-renewable; electricity / fuels)
  • GRI Topic Standards Disclosure 103-2 through the concept “Energy consumption by renewable and non-renewable source”
  • GRI Topic Standards Disclosure 302-1 through the concept “Energy consumption by renewable and non-renewable source”
Diesel F4B3 paragraph 32, second sentenceBreakdown of energy consumption (renewable / non-renewable; electricity / fuels)
  • GRI Topic Standards Disclosure 103-2 through the concept “Energy consumption by renewable and non-renewable source”
  • GRI Topic Standards Disclosure 302-1 through the concept “Energy consumption by renewable and non-renewable source”
Employees F5B8 paragraph 40, point (a)Number of employees by type of employment contract (temporary or permanent)
  • GRI Universal Standards 2021 Disclosure 2-7 through the concept “Employees by type of employment contract”
On permanent contracts F6B8 paragraph 40, point (a)Number of employees by type of employment contract (temporary or permanent)
  • GRI Universal Standards 2021 Disclosure 2-7 through the concept “Employees by type of employment contract”
Training per employee F7B10 paragraph 42, point (d)Average number of annual training hours per employee No reviewed relationship to another framework in this release.
Recordable work accidents F8B9 paragraph 41, point (a)Number and rate of recordable work-related accidents
  • GRI Topic Standards Disclosure 403-9 through the concept “Recordable work-related injuries”
Fatalities from work injuries F9B9 paragraph 41, point (b)Fatalities from recordable work-related accidents and work-related ill health
  • GRI Topic Standards Disclosure 403-9 through the concept “Work-related fatalities”

From the reviewed mappings of Sustin release 2026.6. A relationship shows that two provisions concern the same concept, not that one answer satisfies both. Identifiers only; the frameworks' own texts are not reproduced.

About these figures

Period
Financial year 2027, 1 January to 31 December 2027; headcount at 31 December 2027. Renewable share of purchased electricity for 2027: pending publication (shared with the lender, not yet approved).
Boundary
Tindrevik Components: the Aarhus plant and the Gdańsk workshop, with company vehicles and forklifts. Gas is used at Aarhus only; contractors are not in the accident figures.
Method
Totals of our own records: electricity and gas invoices, the fuel log (diesel as energy, as recorded in the log), the HR headcount export and the accident register. Training per employee: 896 hours divided by 64 employees. Greenhouse gas emissions are not shown: the 2027 calculation is not complete. 2027 is the first year of these records, so there is no prior-year comparison.
Records
Electricity and gas invoices, fuel log; Electricity invoices; Gas invoices; Fuel log; HR headcount export; Accident register
Status
Self-reported. The figures come from Tindrevik Components’s own records and have not been checked by Sustin unless marked otherwise. No figure is a score, rating or label.
Made with
Sustin, release 2026.6 of 28 October 2026. Framework references from the release’s reviewed mappings.

Framework alignment

Frameworks likely to concern this site, from its country, size band and value-chain role, checked against Sustin release 2026.6 on 2026-10-28. This is guidance, not legal advice or a compliance assessment.

Industry 5.0 readiness

Planned (i5Benchmark method, pilot, self-assessed). No scores, badges or rankings are shown.

Fictional organisation, people and records; real town names only for where the sites are said to be. Self-reported: Sustin has not checked these figures. Partners are named with their recorded consent only. SDG targets by identifier, with no UN text; no affiliation with the United Nations. All six style families: Editorial, Corporate clean, Bold data, Nature photography, Civic, Minimal.

Explore living sites